Current State - 2/12/15 |
|
|
The pumps are now mounted and I have started measuring and building the quick connect hoses. I have also ordered a
2 bowl laundry sink which the plumber should have installed early next week. I hope to have the ventilation hood built and installed over the weekend along with mounting the control panel. If everything goes as expected I should be ready for a test run before the end of next week and a brew day Saturday the 21st or Sunday the 22nd!!!